Last updated: 10/8/2025

Temu’s 51-Day Black Friday Campaign: What It Means for Amazon and E-Commerce Sellers

How Temu’s ultra-long sale period is reshaping Q4 logistics, competition, and inventory planning

Black Friday used to be a single day. Then it became a weekend. Now, for some platforms, it’s a full season.

In 2025, Temu announced a record-breaking 51-day Black Friday campaign — starting with a preheating phase on October 9 and continuing until November 29. For sellers, this marks a new era of extended discount cycles and logistics challenges that no longer fit traditional Q4 timelines.

In this article, we’ll explore how Temu’s approach alters the landscape for e-commerce sellers, what it means for Amazon brands competing in the same timeframe, and how Proboxx helps clients adjust their inventory, logistics, and pricing strategies to remain competitive during this “long peak.”


1. The Rise of the Ultra-Long Promotion

Temu’s 2025 Black Friday event officially began its preheating phase on October 9, giving shoppers early access to preview deals and build anticipation weeks before traditional sales even start. The campaign is divided into two main stages:

Preheating period: October 9 – November 1

Main event period: October 31 – November 29

During this 51-day cycle, Temu offers two consistent discount tiers — 15% and 20% off — and encourages sellers to maintain steady inventory, stable pricing, and strong fulfilment capabilities throughout the entire duration.

Why does this matter? Because while Amazon, Walmart, and Shopify merchants traditionally focus on two key weekends (Black Friday and Cyber Monday), Temu is spreading demand across nearly two months.

That fundamentally changes how sellers must plan their logistics and marketing calendars.


2. The Competitive Shift in Q4

For Amazon sellers, the extended Temu sale creates both a challenge and a warning sign.

Consumers are being conditioned to expect more extended sale periods and earlier deals. This shift forces Amazon brands to adapt their own timelines. Waiting until mid-November to stock FBA centers or launch promotions could mean missing a significant portion of early demand.

Consider this:

In 2024, Temu’s app downloads in the U.S. surged 70% between September and November.

Many shoppers completed their holiday purchases before Black Friday even began.

Early-season discount fatigue hit late entrants particularly hard — especially sellers who missed FBA cutoffs or struggled with limited inventory.

In other words, the Q4 “rush” now starts in early October, not late November.


3. How Temu’s Model Works

Temu’s marketplace operates differently from Amazon’s. It’s heavily price-driven, sourcing directly from Chinese manufacturers and offering aggressive discounts. The platform sets strict conditions for sellers to participate in campaigns:

Products must maintain activity prices lower than the suggested retail price.

Sellers must prove sufficient inventory to cover the entire sale period.

Items must comply with the category and performance requirements.

Temu recommends sellers calculate stock as:

“Average daily sales × 7 × 2”
to ensure enough coverage for at least two weeks of consistent traffic.

The platform also requires at least five days of sellable inventory to avoid visibility restrictions in search rankings.

This means that logistics precision — not just pricing — determines who wins visibility and sales.


4. The Pressure on Logistics and Supply Chains

A 51-day campaign completely changes the rhythm of Q4.
Instead of one massive shipping peak, sellers face an extended period of high demand that strains supply chains over time.

Here’s what that looks like in practice:

Earlier shipping deadlines: Sellers need to have stock in position by early October, not mid-November.

Higher inventory holding costs: Maintaining stock for a two-month sale requires additional storage space.

Replenishment complexity: Smaller, more frequent restocks replace the old model of one large shipment in Q4.

Fulfillment speed: Consumers still expect next-day or two-day delivery, even during an extended sale period.

For Amazon sellers competing indirectly with Temu, these same pressures now apply: they must plan for longer campaigns while minimising excess inventory risk.


5. The Amazon Connection

Amazon hasn’t formally extended its Black Friday window to match Temu’s, but the platform’s consumer behaviour is shifting in parallel.

Amazon’s data already shows:

A 35% increase in early-season purchases during Prime Big Deal Days (October).

Faster sell-through rates for Q4 products launched in late September or early October.

Higher conversion rates for brands that maintain stable prices instead of “flash sales.”

The takeaway is clear: Amazon is moving toward an early-start Q4 model, even if it hasn’t labelled it as such.

For sellers, this means syncing logistics not only with Amazon’s inbound deadlines but also with the consumer’s new mindset — one that starts holiday shopping weeks earlier.


6. Key Risks for Sellers in the Long Promotion Cycle

The extended campaign introduces unique operational and financial challenges.

1. Inventory Fatigue

Holding stock for 51 days increases exposure to damage, miscounts, and aging inventory fees.
For Amazon sellers, this can hurt the Inventory Performance Index (IPI) if stock remains unsold after the holidays.

2. Price Compression

With long-running discounts, sellers may face pressure to maintain lower prices for longer periods — eroding profit margins.

3. Demand Uncertainty

An extended sales window spreads out buying behaviour, making it harder to forecast daily velocity.

4. Shipping Bottlenecks

Temu’s volume surge overlaps with Amazon’s inbound peak, crowding carrier capacity. Sellers who ship from Asia face limited container availability and longer port dwell times.


7. Lessons from 2024: Why Early Planning Wins

Last year, Proboxx worked with multiple clients who underestimated how early demand would start.
One U.S. apparel brand delayed its main shipment from Shenzhen until October 10, assuming plenty of time before Black Friday.

The result:

Vessel departed after Golden Week,

Arrived at the port of Los Angeles on November 7,

Spent 9 days waiting for drayage,

Missed Amazon’s inbound appointment until November 22.

By the time their products were live, Temu’s campaign was already halfway through — and conversion rates had dropped sharply due to market saturation.

Contrast that with sellers who shipped by mid-September: their stock reached FBA centres in early October, allowing them to capitalise on both Prime Big Deal Days and the first wave of Temu-driven traffic.


8. How Sellers Can Stay Competitive

Here are five actionable steps Amazon and eCommerce sellers can take to adapt to Temu’s extended sales cycle.

1. Start Campaign Planning by Early September

Your product listings, advertising strategies, and shipping bookings should all align by the first week of September. This ensures your inventory is available when consumers start browsing deals in October.

2. Stagger Shipments Across October and November

Instead of sending one large container, split shipments into multiple waves.
Proboxx often recommends:

70% of inventory shipped before Golden Week

30% shipped via LCL or air freight in early November

This ensures product freshness and flexibility.

3. Use Demand Forecasting Tools

Analyze past Q4 sales velocity, PPC performance, and competitor activity.
Proboxx’s team can help integrate your logistics data with sales forecasts to calculate ideal shipment timing and quantity.

4. Focus on Local Availability

Having stock in U.S. or EU 3PL warehouses enables you to respond more quickly to price changes or marketing shifts.
Proboxx’s dual-coast warehouses help sellers move inventory closer to consumers with same-week FBA replenishment.

5. Review Pricing and Promotion Duration

Avoid keeping deep discounts for too long. Instead, use tiered pricing strategies:

Early October: small, attention-grabbing discounts

Mid-November: aggressive promotional push

Post–Black Friday: limited-time restock offers


9. Proboxx’s Strategy for the Extended Q4 Season

At Proboxx, we help clients treat Q4 not as a single event but as a sequence of interconnected logistics phases.

Our approach includes:

Phase 1 – Pre-Holiday Preparation (August–September)

Confirm production completion and freight-ready dates.

Book shipping space before Golden Week congestion.

Allocate stock between sea and air channels.

Phase 2 – Early Fulfilment Window (October)

Prioritize fast-moving SKUs for immediate shipment to FBA.

Use our Super Express shipping for urgent stock to meet Prime Big Deal Days.

Monitor port congestion and re-route when necessary.

Phase 3 – Peak Replenishment (November)

Send LCL or palletized restocks via Proboxx’s U.S. warehouses.

Maintain FBA sell-through rate and avoid long-term storage fees.

Phase 4 – Post-Peak Optimization (December)

Evaluate product performance, turnover speed, and freight cost efficiency.

Prepare insights for next year’s sourcing and stocking strategy.

This four-phase system ensures stability and control even during unpredictable sales cycles.


10. Case Study: Staying Ahead of the Curve

In 2024, a mid-sized Amazon electronics brand partnered with Proboxx to prepare for Q4. Instead of shipping one large container in October, we developed a rolling shipment schedule:

Container 1: departed mid-September, stocked for early-season deals

Container 2: departed late October for Cyber Week replenishment

Emergency stock: 3 CBM by air freight in mid-November

Results:

22% higher Q4 revenue compared to previous year

31% lower air freight cost due to advanced planning

Zero FBA stockouts despite longer promotional periods

Their takeaway: staying agile beats reacting late.


11. Why Long Promotions Require a Mindset Shift

The old Q4 strategy — ship once, sell once — no longer works.
Extended sale periods require sellers to think in logistics cycles, not single campaigns.

Manufacturers must commit to flexible production capacity.

Forwarders must manage rolling consolidations instead of one big cutoff.

Sellers must forecast in waves, tracking real-time sales data.

This is where data, communication, and partnerships matter most.
At Proboxx, we connect all three — suppliers, carriers, and sellers — in one unified process.


12. The Bigger Picture: The Future of Holiday Sales

Temu’s 51-day promotion isn’t an isolated event. It’s part of a broader eCommerce trend:

Consumers shop earlier and longer.

Platforms compete on logistics efficiency.

Discounts last weeks instead of days.

We can expect similar behaviour from Amazon, Walmart, and Shopify in 2026. That means sellers who start optimizing logistics cycles now will be ready for next year’s even longer Q4.


13. Final Takeaway

Temu’s extended Black Friday campaign signals a significant shift in global e-commerce. It blurs the lines between marketing and logistics — because success now depends on who can plan, ship, and replenish faster, not just who offers deeper discounts.

Key takeaways for sellers:

Start preparing your Q4 logistics plan by early September.

Book freight space and finalize production before Golden Week.

Diversify fulfilment using both FBA and 3PL options.

Use data-driven forecasting to maintain optimal inventory levels.

Partner with a logistics provider that can adapt in real time.

At Proboxx, we help sellers thrive in this new reality — combining digital visibility, flexible shipping solutions, and local warehousing to keep your brand in stock and on schedule.

📞 Want to optimise your Q4 plan?
Book a free consultation and let’s prepare your logistics for the new, extended sales season.

Sign up for our newsletter

Stay up to date with progress, announcements and exclusive discounts. Sign up with your name and email.